Quality First, Reputation First

Home
Products
About Us
Factory Tour
Quality Control
Contact Us
Request A Quote
Home ProductsModular Plastic Formwork

Insulated Modular Plastic Formwork / Plastic Concrete Wall Forms Long Service Life

Easy for use, Nice look

—— Mariah

Verry fast shipping and good service! We Will order again with this seller

—— Lino Weytjens

Respectable seller and good handling of the order and also in the description Thank you very much

—— nezar al azah

I'm Online Chat Now

Insulated Modular Plastic Formwork / Plastic Concrete Wall Forms Long Service Life

China Insulated Modular Plastic Formwork / Plastic Concrete Wall Forms Long Service Life supplier

Large Image :  Insulated Modular Plastic Formwork / Plastic Concrete Wall Forms Long Service Life

Product Details:

Place of Origin: ZHEJIANG,CHINA
Brand Name: ZIH

Payment & Shipping Terms:

Minimum Order Quantity: 500pieces
Price: Negotiable
Packaging Details: Packing Strips
Delivery Time: 10-20 days
Payment Terms: T/T
Supply Ability: 200000 pcs/month
Detailed Product Description
Product Name: ABS Material Plastic Formwork For Building Construction Inner Corner Raw Material: ABS
Product Color: White Size: 150*30*(8-10)cm
Final Product: Wall Product Life: More Than 1500 Times
High Light:

reusable plastic formwork

,

insulated concrete formwork

Insulated Modular Plastic Formwork / Plastic Concrete Wall Forms Long Service Life

 

Plastic Construction Formwork Application Area

Plastic Construction Formwork can be used in Construction Engineering, Bridge Tunnel Engineering, Water Conservancy and Hydropower Engineering, Mine Dykes and Underground Engineering, Pipeline Turnover, etc.
High-rise Building and Construction Engineering
The building formwork is a kind of temporary structure, which is made according to the design requirements, so that the concrete structure and components are shaped according to the prescribed position and geometrical dimensions, maintain their correct positions, and bear the weight of the building formwork and the loads acting on it. The purpose of carrying out the formwork project is to ensure the quality of concrete works and construction safety, speed up construction progress and reduce project costs.

 

Product specification

Product Name ABS material Plastic formwork for building construction inner corner
Raw Material ABS
Product color White
Product Size 150*30*(8-10)cm
Final product Wall
Product Life More than 100 times
Delivery time After prepayment 10 days
Service OEM & ODM service

 

Features

  1. A. Lowest cost, light and easy to release, less labor;
  2. B. Great surface, few air holes, smooth and higher strength;
  3. C. Precise measurement , only 1-2mm tolerance among the products
  4. D. Easy to start business, with moulds, and vibration table
  5. E. Less investment, fast Return

Installation and Usage Instructions
1. The top plate of the plastic building template is used to lay 15mm thick. The vertical die of the shear wall can be 15mm based on the thickness and height of the wall.

2. the distance between the woods:

① roof plastic formwork support: Woods spacing is determined according to the thickness of floor concrete. In general construction conditions, the woods spacing (center distance) is less than 0.15m thickness, which is 200mm to 250mm.

② Supporting shear wall plastic templates: Woods spacing is adjusted by the all wall's height and thickness. For example, the wall height is 2800mm and the wall thickness is 300mm, when the 15mm thickness template is used, the vertical sub rib spacing is 150mm, and the shear wall and pillar width is more than 1 meters, the fixed frame must be added.
3. There is no gap between the shear wall and the column mould, and the part of the Yin angle (the bottom of the wall) must have a wooden side, which is convenient for the connection of the beam, the wall and the formwork. The shear wall formwork must be assembled into a whole after lifting, and then place a flat board , so to reduce labor intensity, and a good forming.

4. The edge of the plastic template is 15 ~ 30mm from the edge of the template. The strength of the nail is moderate and the length of the nail is generally 40 ~ 50mm, so it should not be too long or too short.

5. the wooden side of the floor of the beam must be left out of 1.5 centimeters, and the wall is standing on the mouth of the wooden square, so that it will not leak out the pulp and save the wall material.

Contact Details
Jiaxing Zihong Trading Co.,Ltd.

Contact Person: Mr Feng

Send your inquiry directly to us (0 / 3000)